Click through to see an enlargement!

Click through to see an enlargement!

Power and Communications Duct Bank at Loral Skynet

We are currently working to upgrade the power and communications systems at the Loral Satellite Control Station in Northern California.  The completed project will include a 750 kW UPS system, new switchgear and a new 750 kW standby generator.  All of the work you see in these photos will be encased in concrete and then covered with soil, but that doesn't mean it shouldn't look good before that happens.

 


Click through to see an enlargement!

Operating room at SR Memorial Hospital.

Working in medical, commercial and industrial facilities requires  procedures to ensure that the normal business operations are not interrupted.  We work seamlessly within the systems in place at any facilities we are serving.

 


 

Motor control system at SF Marriott Hotel.

We specialize in the design and turnkey installation of motor control and motor speed control systems.  The above picture is a motor speed control system provided and installed by Blakeslee Electric, Inc.


 

Replacing PG&E transformers with customer owned transformers at the Hyatt Regency at San Francisco Airport.

Installing the 12 kV metering system Hyatt SFO was tricky business.  All of the electric utility company equipment was replaced with with customer owned equipment and 12 kV metering switchgear was added. Coordination on these projects is critical to minimize customer down time.

 


Click here to get a closer look!

12 kV volt transformer at Mather AFB.

It doesn't have to cost more to be perfect, in fact you should expect it. At Blakeslee Electric, Inc. we are proud of our projects and it shows.   Design build or plan and specification construction, either way we will provide you with an electrical installation of the highest quality.

 

 
 
 
 
 